在好例子网,分享、交流、成长!
您当前所在位置:首页Others 开发实例一般编程问题 → ISO15118-1-2013

ISO15118-1-2013

一般编程问题

下载此实例
  • 开发语言:Others
  • 实例大小:1.97M
  • 下载次数:12
  • 浏览次数:395
  • 发布时间:2021-02-26
  • 实例类别:一般编程问题
  • 发 布 人:好学IT男
  • 文件格式:.PDF
  • 所需积分:2
 

实例介绍

【实例简介】
ISO15118-1-2013 电动汽车充电通信
Iso15118-1:2013(E Contents Page Foreword Introduction Scope… Normative references 3 Terms and definitions 2 4 Symbols and abbreviated terms Requirements 10 5.1 Communication concept 10 5.2 General considerations…… 5.3 User-specific requirements 5.4 OEM-specific requirements 12 5.5 Utility-specific requirements Actors 14 6.1 General 14 Use case elements 15 7.1 General 15 7.2 Start of charging proceSs [Al 17 7.3 Communication set-up[B]……… 面1EB道 20 7.4 Certificate handling ci 20 7.5 Identification and Authorization D 7.6 Target setting and charging scheduling e 29 7.7 Charging controlling and re-scheduling FI 36 7.8 Value Added Services [G 7.9 End of charging process [H/ 43 Annex A (informative) Charging infrastructure architecture 45 Annex B (informative) Security 55 Annex C (informative) Examples of charging scenarios derived from the use case elements 60 Bibliography 65 ization f Standard zation rights reserved Iso15118-1:2013(E〕 Foreword ISo (the International Organization for Standardization is a worldwide federation of national standards bodies (Iso member bodies). The work of preparing International Standards is normally carried out o rough iSo technical committees. Each member body interested in a subject for which a technical ommittee has been established has the right to be represented on that committee. International organizations, governmental and non-governmental, in liaison with ISO, also take part in the work Iso collaborates closely with the International Electrotechnical Commission (iEC] on all matters of electrotechnical standardization The procedures used to develop this document and those intended for its further maintenance are described in the ISO/IEC Directives, Part 1. In particular the different approval criteria needed for the different ty pes of iso documents should be noted. This document was drafted in accordance with the editorialrulesoftheISo/iecDirectivesPart2.www.iso.org/directives Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. ISO shall not be held responsible for identifying any or all such patent rights. Details of any patent rights identified during the development of the document will be in the Introduction and or ontheIsolistofpatentdeclarationsreceivedwww.iso.org/patents Any trade name used in this document is information given for the convenience of users and does not constitute an endorsement The committee responsible for this document is ISO/TC 22, Road vehicles, Subcommittee SC 3, Electrical and electronic equipment. IS0 15118-1 was developed in cooperation with ieC tC 69, Electric road vehicles and electric industrial trucks ISo 15118 consists of the following parts, under the general title Road vehicles vehicle to grid communication interface Part 1: General information and use-case definition Part 2: Network and application protocol requirements Part 3: Physical and data link layer reguirements The following parts are under preparation Part 4: Network and application protocol conformance test Part 5: Physical layer and data link layer conformance test 灬: o ISO 2013-All rights reserved Iso15118-1:2013(E Introduction The pending energy crisis and the necessity to reduce greenhouse gas emissions have led vehicle manufacturers to make a very significant effort to reduce the energy consumption of their vehicles They are presently developing vehicles partly or completely propelled by electric energy. Those vehicles will reduce the dependency on oil, improve global energy efficiency and reduce the total CO2 emissions for road transportation if the electricity is produced from renewable sources To charge the batteries of such vehicles, specific charging infrastructure is required Much of the standardization work on dimensional and electrical specifications of the charging infrastructure and the vehicle interface is already treated in the relevant iso or IeC groups. However, the question of in formation transfer between the vehicle, the local installation and the grid has not been treated sufficiently Such communication is beneficial for the optimization of energy resources and energy production systems as vehicles can recharge at the most economic or most energy-efficient instants. It is also required to develop efficient and convenient payment systems in order to cover the resulting micro-payments. The necessary communication channel may serve in the future to contribute to the stabilization ofthe electrical grid as well as to support additional information services required to operate electric vehicles efficiently. ization f Standard zation righ INTERNATIONAL STANDARD Iso15118-1:2013(E Road vehicles- Vehicle to grid communication interface Part 1 General information and use-case definition 1 Scope ISO 15118 specifies the communication between Electric Vehicles (EV), including Battery Electric Vehicles and Plug-In Hybrid Electric Vehicles and the Electric Vehicle Supply equipment(Evse). As the communication parts of this generic equipmentare the Electric Vehicle Communication Controller (EVCc and the Supply Equipment Communication Controller(sECc), ISo 15118 describes the communication between these components. Although ISo 15118 is oriented to the charging of electric road vehicles, it is open for other vehicles as well This part of Iso 15118 specifies terms and definitions, general requirements and use cases as the basis for the other parts of Iso 15118. It provides a general overview and a common understanding of aspects influencing the charge process, pay ment and load levelling ISo 15118 does not specify the vehicle internal communication between battery and charging equipment and the communication of the seCC to other actors and equipment (beside some dedicated message elements related to the charging). All connections beyond the SECC, and the method of message exchanging are considered to be out of the scope as specific use cases NOtE 1 Electric road vehicles specifically are vehicles in categories M (used for carriage of passengers) and N (used for carriage of goods ( compare ECE/TR ANS/WP. 29 /78 ev. 2). This does not prevent vehicles in other categories from adopting Iso 15118 as well NOTE 2 This part of ISo 15118 is destined to orientate the message set ofISo 15118-2 The absence of any particular use case in this part of Iso 15118 does not imply that it shall not put into practice, with the required messages NOTE 3 This part of ISo 15118 and ISo 15118-2 are designed to work independent of data transfer medium used. However, this series of documents are made for fitting the specified data link layers in the corresponding documents in this series 2 Normative references The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document(including any amendments applies IEC 60050, International electrotechnical vocabulary IEC 61851-1, Electric vehicle conductive charging system- Part 1: General requirements ISO/TR 8713, Electrically propelled road vehicles- Vocabulary ISo 15118-2, Road vehicles- Vehicle to grid communication interface- Part 2: Network and application protocol requirements ISO 15118-3, Road Vehicles- Vehicle to grid communication interface- Part 3: Physical and data link layer requirements ization f Standard zation righ Iso15118-1:2013(E〕 3 Terms and definitions For the purposes of this document, the terms and definitions given in ISo/TR 8713 and the following apply 3,1 actor entity which characterizes a role played by a user or any other system that interacts with the subject 3.2 amount of energy for charging energy required by the Ev until the departure time has been reached or the battery's soC is at 100% Note 1 to entry: This might include the amount of energy the ev consumes for other vehicle features than solely charging the battery. 3.3 authentication procedure between EVCC and SECC or between USER and EVSE or SA, to prove that the provided information(see identification) is either correct, valid, or it belongs to the EVCC, the USeR or the SECC 3.4 authorization procedure for evse to verify if ev is allowed to be charged 3.5 basic signalling physical signalling according to the pilot function provided by lEC 61851-1, annex a 3.6 Battery Management System BMS electronic device that controls or manages the electric and thermal functions of the battery system and that provides communication between the battery system and other vehicle controllers 37 certificate electronic document which uses a digital signature to bind a public key with an identity Note 1 to entry: Iso 15118 describes several certificates covering different purposes (e.g. Contract Certificate including the contract ID and OEM Provisioning Certificates) 3.8 charge power converter that performs the necessary functions for charging a battery 3.9 charging control function that confirms the maximum charge current which is allowed to be drawn from evse based or aging schedule Note 1 to entry: Actual charge current to the battery should be controlled by bms. It is not in scope of Iso 15118 3.10 charging scenario combination of use case elements to fulfil a specific charging use case 3.11 charging schedule scheme which contains the power limits for charging the ev for a specific time Note 1 to entry: The Ev should apply the negotiated limits as close as possible, to allow power balancing for the dso 灬: o ISO 2013-All rights reserved Iso15118-1:2013(E EXAMPLE The schedule is calculated based on target setting, sales tariff table and grid schedule information, respecting the corresponding current limitations, i.e. using the lowest current value 3.12 charging session time between the beginning (connection of the cable) and the end (disconnection of the cable) of a hanging process Note 1 to entry: During a charging session the EV may have none, one, or many periods of charging the battery doing pre-conditioning or post-conditioning 3.13 contactor electrically controlled switch used for switching a power circuit Note 1 to entry: Unlike a circuit breaker, a contactor is not intended to interrupt a short circuit current Note 2 to entry: As far as communication is concerned the contactor occurs as a trigger for the power supply 3.14 contract id contract IDentification of the contract that is used by the seCC or secondary actor to enable charging and related services (including billing) customer-specific. The customer can e.g. be the driver, the owner of the vehic and may be vehicle-specific or Note 1 to entry: The contract ID is associated with the electricity consume 3.15 credential document attesting the permission of the ev to be charged 3.16 demand and prognosis function that covers the collection of grid and local installation limits which applies to the actual charging process EXAMPLE Sales tariff table containing a price CO2 content and percentage of renewable energy information vS time based on grid, energy production, energy demand and customer contract information, along with an optional contract-based current limitation. Grid schedule containing a current vS time limitation at the specific eise due to local installation and local electricity demand situation. 3.17 Demand clearing House DCH entity for grid negotiation that provides information on the load of the grid Note 1 to entry: The demand clearing house mediates between two clearing partners: a SeCC and the part of the power grid connected to this sECC. most likely this function will be served by a system operator Note 2 to entry: Demand clearing house and meter operator may exchange information with each other as well as with ot her actors EXAMPLE A DCH typically fulfils following tasks Collect all necessary information from all parts of the power grid, e.g. current or forecasted load of local transformers, distribution grid, power substation, transmission grid, transmission substation, power plants (including renewable energies), and predicted charging schedules submitted by EVCO Consolidate the collected grid information to a"grid profile" and offer it to SECCS/EVCCS. Provide charging schedule proposal for the connected Ev to the requesting SECC based on the collected grid profile ler lingnan zation fo Standard zation righ fI∩n1 ts reserved 3 Iso15118-1:2013(E〕 Inform the seCC as to the necessity for an updated charging schedule if the grid profile has changed On the contrary the secc will inform the demand clearing house if the ev's charging schedule has change 3.18 departure time point in time when the user intends to unplug the car and/or leave the charging location 3.19 Distribution System operator DSO entity responsible for the voltage stability in the distribution grid (medium-and low-voltage power grid Note 1 to entry: Electricity distribution is the final stage in the physical delivery ofelectricity to the delivery point (e.g. end user, EVSE or parking operator Note 2 to entry: A distribution system network carries electricity from the transmission grid and delivers it to consumers. Typically, the network would include medium-voltage power lines, electrical substations and low voltage distribution wiring networks with associated equipment. Depending on national distribution regulations, the dso may also be responsible for metering the energy (mO) 3.20 E-Mobility Operator entity with which the customer has a contract for all services related to the Ev operation Note 1 to entry: Typically the E-Mobility Operator will include some of the other actors, like spot operator or Electricity Provider, and has a close relationship with the distribution system operator and meter operator. An OEM or utility could also fulfil such a role Note 2 to entry: The E-Mobility Operator validates contract IDs from his customers, which were received either from the e-Mobility Operator Clearing House, other E-Mobility Operators or spot operators he is in relation with Note 3 to entry: The E-Mobility Operator issues contract IDs to his customers 3.21 E-Mobility Operator Clearing House EMOCH entity mediating between two clearing partners to provide validation services for roaming regarding contracts of different E-Mobility Operators for the purpose of collecting all necessary contract information like contract ID, E-Mobility Operator, communication path to E-Mobility Operator, roaming fees, begin and end date of contract, etc. providing SeCc with confirmation that an E-Mobility Operator will pay for a given contract ID (authorization of valid contract) transferring a Service Detail Record (sdr) after each charging session to correct E-Mobility Operator and electricity provider of the identified contract Note 1 to entry: E-Mobility Operator Clearing House, E-Mobility Operator and meter operator may exchange in formation with each other as well as other actors 3.22 Electric Energy Meter EEM equipment for measuring electrical energy by integrating power with respect to time, which complies with iec62052-11 and iec62053-21,EC62053-52 Note 1 to entry: Some use cases need the amount of electric energy measured by the electric energy meter and communicated through the SeCC to the EVCC, while other scenarios do not need a separate electric energy meter The ev may get this information and use it according to the OEMs intentions o ISO 2013-All rights reserved 【实例截图】
【核心代码】

标签:

网友评论

第 1 楼 jewin9988 发表于: 2024-04-29 12:27 39
过时的简单规格书,没有什么卵用

支持(0) 盖楼(回复)

发表评论

(您的评论需要经过审核才能显示)

查看所有1条评论>>

小贴士

感谢您为本站写下的评论,您的评论对其它用户来说具有重要的参考价值,所以请认真填写。

  • 类似“顶”、“沙发”之类没有营养的文字,对勤劳贡献的楼主来说是令人沮丧的反馈信息。
  • 相信您也不想看到一排文字/表情墙,所以请不要反馈意义不大的重复字符,也请尽量不要纯表情的回复。
  • 提问之前请再仔细看一遍楼主的说明,或许是您遗漏了。
  • 请勿到处挖坑绊人、招贴广告。既占空间让人厌烦,又没人会搭理,于人于己都无利。

关于好例子网

本站旨在为广大IT学习爱好者提供一个非营利性互相学习交流分享平台。本站所有资源都可以被免费获取学习研究。本站资源来自网友分享,对搜索内容的合法性不具有预见性、识别性、控制性,仅供学习研究,请务必在下载后24小时内给予删除,不得用于其他任何用途,否则后果自负。基于互联网的特殊性,平台无法对用户传输的作品、信息、内容的权属或合法性、安全性、合规性、真实性、科学性、完整权、有效性等进行实质审查;无论平台是否已进行审查,用户均应自行承担因其传输的作品、信息、内容而可能或已经产生的侵权或权属纠纷等法律责任。本站所有资源不代表本站的观点或立场,基于网友分享,根据中国法律《信息网络传播权保护条例》第二十二与二十三条之规定,若资源存在侵权或相关问题请联系本站客服人员,点此联系我们。关于更多版权及免责申明参见 版权及免责申明

;
报警